Organisations
Also known as: PLTSa Suwung, waste-to-energy plant
Other tiesIn the news together
points to the plant as the solution and cites its 2027 completion and operation dates
Our story: Koster promised to shut Bali's Suwung landfill by December 2025. It is still openWho is named in the same stories most often over the past year, and the newest story linking them.
Facts on this page come from public records and credible reports, or from relations stated in our own stories. Each one links to its source. Being connected to someone is not evidence of wrongdoing. To report an error or a missing fact, write to [email protected].
The waste-to-energy plant at Suwung is targeted for completion. · Waste-to-energy plant at Suwung
Story: Koster promised to shut Bali's Suwung landfill by December 2025. It is still openThe waste-to-energy plant at Suwung is targeted to begin full operation. · Waste-to-energy plant at Suwung
Story: Koster promised to shut Bali's Suwung landfill by December 2025. It is still open